Battery-News

LG Energy Solution Reportedly Prepares LMR Battery Production Lines

LG Energy Solution is preparing mass production lines for lithium manganese-rich (LMR) batteries, according to industry sources cited on November 25. The company is reportedly in talks with key suppliers and is set to launch equipment bidding soon. LG Energy Solution has not officially confirmed the plans.

Faster Notching and Stacking

Production is said to be planned at Ultium Cells, the joint venture with GM in Spring Hill, Tennessee, using a prismatic format requested by GM. Eight production lines are reportedly targeted in two phases of four lines each, with mass production scheduled for 2028. The scale of investment is said to depend on GM’s EV sales. Toyota and Honda are named as potential further customers. According to the sources, the focus is on accelerating notching and stacking, with LG Energy Solution evaluating stacking cycle times below 0.3 seconds.

Addressing LMR Weaknesses

LMR cells are known to lose some lithium during initial charging and to suffer voltage decay over their life. To counter this, the company is reportedly working on cathode coatings, silicon anode materials, and adjustments to separators, electrolytes, and additives. Capacity in GWh and suppliers have not been disclosed.

In May 2025, GM and LG Energy Solution announced that their LMR prismatic cell offers 33% higher energy density than the best-performing LFP cells at a comparable cost, with Ultium Cells planning commercial production in the US by 2028.

Sources:
https://thelec.net/news/articleView.html?idxno=15898
https://investor.gm.com/news-releases/news-release-details/gm-and-lg-energy-solution-pioneer-lmr-battery-cell-technology/

Newsletter

Hinweise zum Artikel

Empfehlung

  • All Post
  • Advertisement
  • Anzeige
  • Battery Development
  • Battery Material
  • Battery Production
  • Battery Recycling
  • Comment
  • Nicht kategorisiert
  • Top Story
  • Top-Story EN
Geladen – Der Batterie-Podcast
Scroll to Top